Just Released
📅 November 2025

Visa Bulletin is Out!

Check your priority dates and filing information now

View Details →
Spanish
VisaVerge official logo in Light white color VisaVerge official logo in Light white color
  • Home
  • Airlines
  • H1B
  • Immigration
    • Knowledge
    • Questions
    • Documentation
  • News
  • Visa
    • Canada
    • F1Visa
    • Passport
    • Green Card
    • H1B
    • OPT
    • PERM
    • Travel
    • Travel Requirements
    • Visa Requirements
  • USCIS
  • Questions
    • Australia Immigration
    • Green Card
    • H1B
    • Immigration
    • Passport
    • PERM
    • UK Immigration
    • USCIS
    • Legal
    • India
    • NRI
  • Guides
    • Taxes
    • Legal
  • Tools
    • H-1B Maxout Calculator Online
    • REAL ID Requirements Checker tool
    • ROTH IRA Calculator Online
    • TSA Acceptable ID Checker Online Tool
    • H-1B Registration Checklist
    • Schengen Short-Stay Visa Calculator
    • H-1B Cost Calculator Online
    • USA Merit Based Points Calculator – Proposed
    • Canada Express Entry Points Calculator
    • New Zealand’s Skilled Migrant Points Calculator
    • Resources Hub
    • Visa Photo Requirements Checker Online
    • I-94 Expiration Calculator Online
    • CSPA Age-Out Calculator Online
    • OPT Timeline Calculator Online
    • B1/B2 Tourist Visa Stay Calculator online
  • Schengen
VisaVergeVisaVerge
Search
Follow US
  • Home
  • Airlines
  • H1B
  • Immigration
  • News
  • Visa
  • USCIS
  • Questions
  • Guides
  • Tools
  • Schengen
© 2025 VisaVerge Network. All Rights Reserved.
News

Nasiriyah International Airport 85% complete, opening by 2025 year-end

Nasiriyah International Airport is 85% complete and set to open by end-2025, with runway finished, exterior 95% complete, and terminal 82% done. The 16 million sq. m. site will serve 750,000+ passengers annually after equipment installation, testing, road completion, and staff training.

Last updated: October 6, 2025 12:12 pm
SHARE
VisaVerge.com
📋
Key takeaways
Nasiriyah International Airport is 85% complete and scheduled to open by the end of 2025.
Runway and taxiway are fully finished; exterior buildings 95% and terminal 82% complete.
Airport covers 16 million sq. m., has a 3,400 m runway and 750,000+ annual passenger capacity.

Iraq’s Ministry of Transport says construction of Nasiriyah International Airport has reached 85% and is on schedule to open by the end of 2025, marking one of the country’s most advanced aviation projects in years. Minister Razzaq Al-Saadawi confirmed the status and timeline, noting that the exterior buildings are 95% complete, the runway and taxiway are fully finished, and the main passenger terminal has reached 82% completion.

The airport spans 16 million square meters and is designed for more than 750,000 passengers per year, with facilities for both domestic and international flights.

Nasiriyah International Airport 85% complete, opening by 2025 year-end
Nasiriyah International Airport 85% complete, opening by 2025 year-end

Construction status and immediate next steps

  • Core airside infrastructure — the runway and taxiway — are fully finished.
  • Exterior buildings: 95% complete.
  • Main passenger terminal: 82% complete.
  • Overall project completion: 85%.

The project’s next phases focus on:

  1. Installing modern operational equipment required for international flights.
  2. Completing interior systems, passenger handling areas (check-in, security), and the baggage system.
  3. Finishing final fit-outs and conducting safety and operational testing.
  4. Completing four main access roads to connect the airport with surrounding areas.
  5. Preparing and training staff for passenger operations.

The Ministry expects the airport to be operational by the end of 2025, aligning with previously stated goals.

💡 Tip
Plan to verify the airport’s readiness by confirming three key items: systems installation progress, staff training completion, and safety testing schedules before the end-2025 target.

Facilities, capacity, and design features

  • Footprint: 16 million square meters, allowing room for future growth.
  • Runway length: 3,400 meters, suitable for a range of aircraft types.
  • Planned annual capacity: 750,000+ passengers, supporting both domestic and international services.
  • Included facilities: terminal, control tower, hotel, and parking areas.

These elements are designed to reduce travel time for residents of Dhi Qar Governorate, alleviate pressure on existing airports, and support both passenger and air cargo needs.

Regional and economic context

Officials present the airport as a key component of Iraq’s Development Road Initiative, aimed at improving transport links and accelerating trade and travel in southern Iraq. The Ministry positions this project alongside upgrades at Baghdad and Mosul International Airports as part of a nationwide civil aviation modernization effort.

  • Expected benefits:
    • Improved access to domestic routes and international gateways.
    • Economic stimulus through jobs, services, and better cargo logistics.
    • Reduced travel time and cost for families, students, and workers who currently travel to other airports.

The airport’s placement in Nasiriyah also carries symbolic and political weight: the city was central in the 2019 Tishreen protest movement, and local leaders have sought visible progress in public works and employment.

Phased operational ramp-up and outlook

Planners expect a gradual ramp-up once construction and systems installation are complete. Key points:

  • The capacity target suggests a steady flow of passengers rather than an immediate surge, allowing operations to stabilize as airlines schedule routes.
  • With the runway and taxiway complete and exterior works near completion, remaining tasks are largely technical: systems installation, testing, and staff preparation.
  • The project’s large site and inclusion of a hotel and parking indicate planning for passenger comfort and potential future expansion.

While aviation projects sometimes face delays, the Ministry’s repeated emphasis on 85% completion and the specific component percentages provides a clear public benchmark and sets expectations for the end of 2025 opening.

⚠️ Important
If you’re tracking timelines, note that construction can be affected by funding or security issues; assume possible minor delays and monitor official updates closely.

How this fits into wider transport plans

  • Four main access roads are being completed to integrate the airport into regional transport networks.
  • Road and equipment installation work are being coordinated to keep the opening timeline on track.
  • The airport is intended to contribute to broader goals of raising safety, service quality, and capacity across Iraq’s civil aviation system.

For official notices and updates, monitor the Iraq Ministry of Transport.

Key takeaways

  • Nasiriyah International Airport is 85% complete and targeted to open by the end of 2025.
  • Exterior works are 95% done; the terminal is 82% complete; runway and taxiway are finished.
  • The facility covers 16 million sq. m., has a 3,400 m runway, and is designed for 750,000+ passengers annually.
  • Remaining work centers on equipment installation, access roads, testing, and staff readiness.

These milestones suggest steady momentum toward opening and potential economic and travel benefits for Nasiriyah, Dhi Qar, and southern Iraq once the airport becomes operational.

VisaVerge.com
Learn Today
runway → A paved strip where aircraft take off and land; here it is 3,400 meters long to handle various aircraft types.
taxiway → Paved paths connecting runways to terminals and aprons used by aircraft to move on the ground.
terminal → The main passenger building handling check-in, security, boarding, arrival processing, and passenger services.
airside → The part of an airport restricted to aircraft operations, including runways, taxiways, aprons, and related infrastructure.
fit-out → The final interior finishing work that equips buildings with fixtures, systems, and furnishings for operation.
operational testing → Trials and checks of systems and procedures to ensure safety and readiness before commercial flights begin.
Development Road Initiative → Iraq’s program to improve transport links and accelerate trade and travel, including airport modernization projects.
capacity → The estimated number of passengers an airport can handle annually; Nasiriyah is planned for 750,000+ passengers.

This Article in a Nutshell

Nasiriyah International Airport in southern Iraq has reached 85% completion and aims to open by the end of 2025, Transport Minister Razzaq Al-Saadawi said. Key milestones include a fully finished runway and taxiway, 95% completion of exterior buildings, and 82% completion of the main passenger terminal. The airport spans 16 million square meters, features a 3,400-meter runway, and is designed for over 750,000 passengers annually. Remaining work focuses on installing international-standard equipment, completing interiors and access roads, conducting safety and operational testing, and staff training. Officials expect a phased ramp-up to gradually stabilize passenger services and boost regional economic activity.

— VisaVerge.com
Share This Article
Facebook Pinterest Whatsapp Whatsapp Reddit Email Copy Link Print
What do you think?
Happy0
Sad0
Angry0
Embarrass0
Surprise0
Oliver Mercer
ByOliver Mercer
Chief Editor
Follow:
As the Chief Editor at VisaVerge.com, Oliver Mercer is instrumental in steering the website's focus on immigration, visa, and travel news. His role encompasses curating and editing content, guiding a team of writers, and ensuring factual accuracy and relevance in every article. Under Oliver's leadership, VisaVerge.com has become a go-to source for clear, comprehensive, and up-to-date information, helping readers navigate the complexities of global immigration and travel with confidence and ease.
Subscribe
Login
Notify of
guest

guest

0 Comments
Inline Feedbacks
View all comments
U.S. Visa Invitation Letter Guide with Sample Letters
Visa

U.S. Visa Invitation Letter Guide with Sample Letters

U.S. Re-entry Requirements After International Travel
Knowledge

U.S. Re-entry Requirements After International Travel

Opening a Bank Account in the UK for US Citizens: A Guide for Expats
Knowledge

Opening a Bank Account in the UK for US Citizens: A Guide for Expats

Guide to Filling Out the Customs Declaration Form 6059B in the US
Travel

Guide to Filling Out the Customs Declaration Form 6059B in the US

How to Get a B-2 Tourist Visa for Your Parents
Guides

How to Get a B-2 Tourist Visa for Your Parents

How to Fill Form I-589: Asylum Application Guide
Guides

How to Fill Form I-589: Asylum Application Guide

Visa Requirements and Documents for Traveling to Cote d’Ivoire (Ivory Coast)
Knowledge

Visa Requirements and Documents for Traveling to Cote d’Ivoire (Ivory Coast)

Renew Indian Passport in USA: Step-by-Step Guide
Knowledge

Renew Indian Passport in USA: Step-by-Step Guide

You Might Also Like

Deportation of B.C. Climate Activist Cancelled: Zain Haq to Stay in Canada
Canada

Deportation of B.C. Climate Activist Cancelled: Zain Haq to Stay in Canada

By Oliver Mercer
ICE Agents Arrest One Suspect After Attempted Vehicle Ramming in Colorado
Immigration

ICE Agents Arrest One Suspect After Attempted Vehicle Ramming in Colorado

By Oliver Mercer
More Than 1,500 Syrians Prepare to Depart Cyprus
News

More Than 1,500 Syrians Prepare to Depart Cyprus

By Shashank Singh
Federal Grand Jury Hits Wisconsin Judge in Immigration Case
Immigration

Federal Grand Jury Hits Wisconsin Judge in Immigration Case

By Oliver Mercer
Show More
VisaVerge official logo in Light white color VisaVerge official logo in Light white color
Facebook Twitter Youtube Rss Instagram Android

About US


At VisaVerge, we understand that the journey of immigration and travel is more than just a process; it’s a deeply personal experience that shapes futures and fulfills dreams. Our mission is to demystify the intricacies of immigration laws, visa procedures, and travel information, making them accessible and understandable for everyone.

Trending
  • Canada
  • F1Visa
  • Guides
  • Legal
  • NRI
  • Questions
  • Situations
  • USCIS
Useful Links
  • History
  • Holidays 2025
  • LinkInBio
  • My Feed
  • My Saves
  • My Interests
  • Resources Hub
  • Contact USCIS
VisaVerge

2025 © VisaVerge. All Rights Reserved.

  • About US
  • Community Guidelines
  • Contact US
  • Cookie Policy
  • Disclaimer
  • Ethics Statement
  • Privacy Policy
  • Terms and Conditions
wpDiscuz
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?